What to send us

Share your project address, plans, photos, proposed changes and any instructions from your certifier. Include a site survey and soil report if available. If you do not have everything yet, we can identify the next steps.

Timing, without assumptions

Confirmed with your written quote Site access, missing information and changes to plans can affect the programme.

Form 15 vs Form 16

Form 15 relates to the compliance of a design or specification. Form 16 records an inspection of an aspect of building work. Your building certifier confirms the required certificates and stages; neither form replaces the other.

Before you build

Check the agreed scope, approval requirements and inspection hold points. Arrange inspections before work is covered up. Contact the engineer when designs or site conditions change.