Your scope determines the fee

A site inspection, a written defect report and a full structural drawing package involve different work. Fees reflect the time needed to assess the structure, complete calculations, document the design and coordinate the agreed scope.

What influences the cost?

  • The size and complexity of the proposed structure.
  • Existing drawings, soil information and site access.
  • Whether a site visit or further investigation is needed.
  • Calculations, drawings, reports and certificates required.
  • Design changes and the project programme.

Indicative ranges — owner to supply

Inspection and report: [$XXX–$XXX]
Wall removal engineering: [$XXX–$XXX]
New home drawings: [$XXX–$XXX]
Retaining wall design: [$XXX–$XXX]

These are unfilled pricing placeholders, not published fees. Every job receives a written fixed-fee quote. Any additional work is discussed before proceeding.

Get a useful quote

Send your plans, suburb and photos and tell us what your builder or certifier has requested. Clear information helps us define the engineering scope accurately.

Get a Quote